The use of electricity in an overall industrial process is not automatically sufficient to be classified as being used for chemical reduction. It depends on what the electricity does in the specific sub-process.

What matters in each individual case

The electrical work of a fan and the chemical effect of the medium blown in must not be equated. A short technical report can show where the energy is actually implemented.

Practical case and recommendation for action

A company only measures the total demand of the blast furnace. Draw the blower, compression and reaction in a process diagram and assign the measuring points to the individual steps.

When it comes to checking, a quantity and time calculation is usually more informative than a pure statement of values. Track a unit from entry through usage to exit. Record which point measured or classified the goods. If there is only one mathematical distribution, its basis should be understandable even without the knowledge of the person responsible at the time.

Three more test situations

If mixed use, explain the subquantities and the method of determining them.

When changing operators, document who the system, goods or vehicle was assigned to on the relevant day.

In the event of a subsequent request, compare the official quantity acceptance with original receipts from a representative period.

Legal source and advice

ECJ, judgment of September 7, 2017 · C-465/15