Not all electricity consumption by an integrated power plant is used directly to generate electricity or to maintain its ability to generate electricity. The extraction of fuel must be distinguished from the subsequent process in the power plant.

What matters in each individual case

Storing a fuel can have a different function than extracting it. A technically continuous conveyor belt can therefore comprise several sections that have to be differentiated for tax purposes.

Practical case and recommendation for action

One location measures opencast mining and coal bunkers together. Assign conveyor belts, bunkers and ancillary systems to a process step according to function and removal point.

When it comes to checking, a quantity and time calculation is usually more informative than a pure statement of values. Track a unit from entry through usage to exit. Record which point measured or classified the goods. If there is only one mathematical distribution, its basis should be understandable even without the knowledge of the person responsible at the time.

Three more test situations

If mixed use, explain the subquantities and the method of determining them.

When changing operators, document who the system, goods or vehicle was assigned to on the relevant day.

In the event of a subsequent request, compare the official quantity acceptance with original receipts from a representative period.

Legal source and advice

ECJ, judgment of March 9, 2023 · C-571/21